ZLD(zero liquid discharge) of FGD Wastewater Spray Dryer Technology by Using High Temperature Flue Gas Before ESP

Process Introduction
When using the spray dryer technology to treat FGD wastewater, wastewater will be atomized through nozzle or rotary atomizer in by-pass drying tower, then will be quickly evaporated by the hot flue gas which has been denitrated and would be sent to air preheater later, the evaporated water will go with flue gas and at the same time the salt compound in the wastewater will betreated separately after dried and collected, or be delivered back to pipeline and captured by ESP.




Technical Features
This technology only uses a small amount of hot flue gas, have small influence on boiler system and no need to do complicated preprocess to wastewater. When the dried ash from wastewater is captured by ESP, it will not affect the integrated utility of coal ash, but solve the problem of solid waste disposal. The whole system has several advantages as follow: simple process, small footprint, easy maintenance (without influence on the main system), low cost for construction and operation.


Jiangyin Zhouzhuang Thermal Power Plant FGD Waste Water Treatment Project 

This project involving 3 units was started from the beginning of August 2017, and put into operation in 2017 November , 2018 January and the end of April 2018.


                 



SOCIAL

Copyright (C) 2010 Beijing Longyuan Environmental Protection Engineering Co. Ltd. Beijing ICP No. 09076368 Beijing Public Security No. 110108007976 
深圳保鏢公司污水處理玻璃鋼水箱電纜廠家
和林格尔县| 哈巴河县| 嘉鱼县| 玉屏| 平山县| 汨罗市| 静乐县| 乐陵市| 武山县| 梁山县| 泊头市| 普兰县| 吉林省| 手机| 逊克县| 岫岩| 洛川县| 喀喇沁旗| 高尔夫| 历史| 田林县| 峨边| 钟祥市| 游戏| 洪泽县| 开阳县| 集安市| 毕节市| 深水埗区| 抚州市| 青龙| 岫岩| 新巴尔虎左旗| 乳源| 哈巴河县| 屏东市| 芜湖县| 临武县| 湘潭市| 龙口市| 额尔古纳市|