Combination of Absorber and Chimney Limestone/ lime-gypsum Wet Process FGD

Process Introduction

The flue gas from electrostatic precipitator is discharged into absorber and reacts with limestone slurry through booster fan, and produces gypsum. The treated flue gas after desulfurization is emitted into the atmosphere by the straight chimney set at the top of absorber. Through two times dehydration, the moisture content of gypsum is not more than 10%.

Technical Features

 Smaller footprint, especially suitable for retrofit project with limited space; 

 No need to reconstruct the old stack; 

 Lower capital cost (without GGH and treated gas duct) and operation energy consumption; 

 Shorter construction duration (about 4 months can be shortened). 

Jiangyin Thermal Power Co., Ltd  Retrofit Project
















SOCIAL

Copyright (C) 2010 Beijing Longyuan Environmental Protection Engineering Co. Ltd. Beijing ICP No. 09076368 Beijing Public Security No. 110108007976 
深圳保鏢公司污水處理玻璃鋼水箱電纜廠家
莱阳市| 泰安市| 寿阳县| 五大连池市| 开封市| 万年县| 扬中市| 铜梁县| 青海省| 奎屯市| 思南县| 东明县| 鄄城县| 商都县| 抚宁县| 西昌市| 五原县| 利川市| 宁河县| 醴陵市| 阳山县| 大名县| 敖汉旗| 邯郸市| 新巴尔虎左旗| 中江县| 修武县| 确山县| 健康| 桃园市| 清流县| 灵川县| 师宗县| 康保县| 芮城县| 望奎县| 伊通| 钟祥市| 沁阳市| 庆元县| 佳木斯市|