Combination of Absorber and Chimney Limestone/ lime-gypsum Wet Process FGD

Process Introduction

The flue gas from electrostatic precipitator is discharged into absorber and reacts with limestone slurry through booster fan, and produces gypsum. The treated flue gas after desulfurization is emitted into the atmosphere by the straight chimney set at the top of absorber. Through two times dehydration, the moisture content of gypsum is not more than 10%.

Technical Features

 Smaller footprint, especially suitable for retrofit project with limited space; 

 No need to reconstruct the old stack; 

 Lower capital cost (without GGH and treated gas duct) and operation energy consumption; 

 Shorter construction duration (about 4 months can be shortened). 

Jiangyin Thermal Power Co., Ltd  Retrofit Project
















SOCIAL

Copyright (C) 2010 Beijing Longyuan Environmental Protection Engineering Co. Ltd. Beijing ICP No. 09076368 Beijing Public Security No. 110108007976 
深圳保鏢公司污水處理玻璃鋼水箱電纜廠家
喀喇沁旗| 津南区| 临颍县| 长汀县| 广安市| 襄城县| 宁强县| 富民县| 定南县| 若尔盖县| 保定市| 大港区| 溧水县| 海盐县| 永定县| 大田县| 日土县| 周口市| 丹东市| 嘉兴市| 浦城县| 敦煌市| 吉木乃县| 蒲江县| 九龙城区| 万山特区| 清河县| 郑州市| 金坛市| 仪陇县| 高阳县| 嘉义县| 兴山县| 宣城市| 甘孜县| 连云港市| 冷水江市| 宜昌市| 班玛县| 铜梁县| 邻水|